US Bridges

NFSR 235 over Fairview Cr.

Good

Lewis and Clark County, Montana · Fairview Cr. No. 1 · Structure no. 011501000000064

Built
1977
48 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
40
Owner
Federal
U.S. Forest Service

About this bridge

NFSR 235 over Fairview Cr. is a prestressed concrete stringer/multi-beam or girder carrying NFSR 235 over Fairview Cr. in Lewis and Clark County, Montana. It was built in 1977, so it is 48 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 60 by 2045. The structure is 70 ft (21.3 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesNFSR 235
CrossesFairview Cr.
LocationFairview Cr. No. 1
RouteFederal Lands Road 235
StateMontana
Coordinates47.47518, -112.86212
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating23.3 US tons
Inventory rating11 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length70 ft (21.3 m)
Longest span66 ft (20.2 m)
Deck width16 ft (5 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (—)
Projected traffic60 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NFSR 235 over Fairview Cr. built?

It was built in 1977, making it 48 years old in 2025.

What condition is NFSR 235 over Fairview Cr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does NFSR 235 over Fairview Cr. carry?

About 40 vehicles per day (latest count).

How long is NFSR 235 over Fairview Cr.?

The structure is 70 ft (21.3 m) long with a longest span of 66 ft (20.2 m) and a deck 16 ft wide.

Who owns NFSR 235 over Fairview Cr.?

It is owned by the U.S. Forest Service.