IRR - S 212 over Mission Creek
FairLake County, Montana · Moiese · Structure no. S00212005+00991
- Built
- 1959
- 66 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 75 ft
- 3 main spans
- Daily traffic
- 922
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IRR - S 212 over Mission Creek is a wood or timber stringer/multi-beam or girder carrying IRR - S 212 over Mission Creek in Lake County, Montana. It was built in 1959, so it is 66 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 922 vehicles a day, roughly 3% of them trucks, projected to reach 968 by 2043. The structure is 75 ft (22.9 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR - S 212 over Mission Creek built?
It was built in 1959, making it 66 years old in 2025.
What condition is IRR - S 212 over Mission Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does IRR - S 212 over Mission Creek carry?
About 922 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is IRR - S 212 over Mission Creek?
The structure is 75 ft (22.9 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.
Who owns IRR - S 212 over Mission Creek?
It is owned by the State Highway Agency.