US Bridges

S 83 FH 15 over Lion Creek

Fair

Lake County, Montana · 17M S Swan Lake · Structure no. P00083053+09801

Built
1996
29 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
81 ft
1 main span
Daily traffic
1,289
2023 count
Owner
State
State Highway Agency

About this bridge

S 83 FH 15 over Lion Creek is a prestressed concrete stringer/multi-beam or girder carrying S 83 FH 15 over Lion Creek in Lake County, Montana. It was built in 1996, so it is 29 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,289 vehicles a day, roughly 6% of them trucks, projected to reach 1,353 by 2043. The structure is 81 ft (24.7 m) long and 42 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesS 83 FH 15
CrossesLion Creek
Location17M S Swan Lake
RouteState Highway 83
StateMontana
Coordinates47.68222, -113.81019
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length81 ft (24.7 m)
Longest span81 ft (24.7 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,289 (2023)
Projected traffic1,353 by 2043
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 83 FH 15 over Lion Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is S 83 FH 15 over Lion Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does S 83 FH 15 over Lion Creek carry?

About 1,289 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is S 83 FH 15 over Lion Creek?

The structure is 81 ft (24.7 m) long with a longest span of 81 ft (24.7 m) and a deck 42 ft wide.

Who owns S 83 FH 15 over Lion Creek?

It is owned by the State Highway Agency.