Delaney Way over Post Creek 074
FairPosted for loadLake County, Montana · 8M S Ronan · Structure no. 000000000003318
- Built
- 2017
- 8 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Delaney Way over Post Creek 074 is a steel stringer/multi-beam or girder carrying Delaney Way over Post Creek 074 in Lake County, Montana. It was built in 2017, so it is 8 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 50 ft (15.3 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Delaney Way over Post Creek 074 built?
It was built in 2017, making it 8 years old in 2025.
What condition is Delaney Way over Post Creek 074 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Delaney Way over Post Creek 074 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Delaney Way over Post Creek 074?
The structure is 50 ft (15.3 m) long with a longest span of 48 ft (14.6 m) and a deck 24 ft wide.
Who owns Delaney Way over Post Creek 074?
It is owned by the County Highway Agency.