S Peak RD over Arrow Creek 038
GoodJudith Basin County, Montana · 6M NW Geyser · Structure no. L23220000+06001
- Built
- 2009
- 16 years old, rebuilt 2013
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
S Peak RD over Arrow Creek 038 is a steel stringer/multi-beam or girder carrying S Peak RD over Arrow Creek 038 in Judith Basin County, Montana. It was built in 2009 and reconstructed in 2013, so it is 16 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 50 ft (15.2 m) long and 25 ft wide. If it were closed, the detour would be 62.1 mi (100 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Peak RD over Arrow Creek 038 built?
It was built in 2009, making it 16 years old in 2025. It was reconstructed in 2013.
What condition is S Peak RD over Arrow Creek 038 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does S Peak RD over Arrow Creek 038 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is S Peak RD over Arrow Creek 038?
The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.1 m) and a deck 25 ft wide.
Who owns S Peak RD over Arrow Creek 038?
It is owned by the County Highway Agency.