US Bridges

I 90 Eastbound over Boulder River

Good

Jefferson County, Montana · 0.6M E Cardwell · Structure no. I00090256+08671

Built
1968
57 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
124 ft
2 main spans
Daily traffic
5,599
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 Eastbound over Boulder River is a prestressed concrete stringer/multi-beam or girder carrying I 90 Eastbound over Boulder River in Jefferson County, Montana. It was built in 1968, so it is 57 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,599 vehicles a day, roughly 18% of them trucks, projected to reach 6,214 by 2043. The structure is 124 ft (37.7 m) long and 38 ft wide. If it were closed, the detour would be 80.2 mi (129 km).

CarriesI 90 Eastbound
CrossesBoulder River
Location0.6M E Cardwell
RouteInterstate 90
StateMontana
Coordinates45.87026, -111.94276
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating46 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length124 ft (37.7 m)
Longest span56 ft (17.1 m)
Deck width38 ft (11.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,599 (2023)
Projected traffic6,214 by 2043
Trucks18%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed80.2 mi (129 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I 90 Eastbound over Boulder River built?

It was built in 1968, making it 57 years old in 2025.

What condition is I 90 Eastbound over Boulder River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I 90 Eastbound over Boulder River carry?

About 5,599 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is I 90 Eastbound over Boulder River?

The structure is 124 ft (37.7 m) long with a longest span of 56 ft (17.1 m) and a deck 38 ft wide.

Who owns I 90 Eastbound over Boulder River?

It is owned by the State Highway Agency.