US Bridges

IRR BIA RTE 133 over Box Elder Creek

Fair

Hill County, Montana · .2 S RTE 24 1.6 SE Sangry · Structure no. 00000000000C913

Built
1984
41 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
60
2024 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 133 over Box Elder Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 133 over Box Elder Creek in Hill County, Montana. It was built in 1984, so it is 41 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 60 vehicles a day, roughly 5% of them trucks, projected to reach 70 by 2044. The structure is 42 ft (12.8 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIRR BIA RTE 133
CrossesBox Elder Creek
Location.2 S RTE 24 1.6 SE Sangry
RouteFederal Lands Road 133
StateMontana
Coordinates48.27242, -109.80833
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating55 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span40 ft (12.2 m)
Deck width34 ft (10.4 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2024)
Projected traffic70 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 133 over Box Elder Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is IRR BIA RTE 133 over Box Elder Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does IRR BIA RTE 133 over Box Elder Creek carry?

About 60 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 133 over Box Elder Creek?

The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 34 ft wide.

Who owns IRR BIA RTE 133 over Box Elder Creek?

It is owned by the Bureau of Indian Affairs.