NPS Service Road over Upper Divide Creek
FairGlacier County, Montana · Just South of Going-To-Th · Structure no. 1430045S0000000
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected September 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 50
- 2017 count
- Owner
- Federal
- National Park Service
About this bridge
NPS Service Road over Upper Divide Creek is a prestressed concrete tee beam carrying NPS Service Road over Upper Divide Creek in Glacier County, Montana. It was built in 1970, so it is 55 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 60 by 2037. The structure is 100 ft (30.5 m) long and 13 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NPS Service Road over Upper Divide Creek built?
It was built in 1970, making it 55 years old in 2025.
What condition is NPS Service Road over Upper Divide Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does NPS Service Road over Upper Divide Creek carry?
About 50 vehicles per day (2017 count), of which roughly 1% are trucks.
How long is NPS Service Road over Upper Divide Creek?
The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 13 ft wide.
Who owns NPS Service Road over Upper Divide Creek?
It is owned by the National Park Service.