US Bridges

IRR BIA RTE 4 over Four Horns Canal

Good

Glacier County, Montana · 8.1 KM N of Heart Butte · Structure no. 00000000000C108

Built
1972
53 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
500
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 4 over Four Horns Canal is a prestressed concrete stringer/multi-beam or girder carrying IRR BIA RTE 4 over Four Horns Canal in Glacier County, Montana. It was built in 1972, so it is 53 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 585 by 2043. The structure is 48 ft (14.5 m) long and 34 ft wide. If it were closed, the detour would be 49.7 mi (80 km).

CarriesIRR BIA RTE 4
CrossesFour Horns Canal
Location8.1 KM N of Heart Butte
RouteFederal Lands Road 4
StateMontana
Coordinates48.36147, -112.80447
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.5 US tons
Inventory rating31.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length48 ft (14.5 m)
Longest span45 ft (13.7 m)
Deck width34 ft (10.4 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2023)
Projected traffic585 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 4 over Four Horns Canal built?

It was built in 1972, making it 53 years old in 2025.

What condition is IRR BIA RTE 4 over Four Horns Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does IRR BIA RTE 4 over Four Horns Canal carry?

About 500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is IRR BIA RTE 4 over Four Horns Canal?

The structure is 48 ft (14.5 m) long with a longest span of 45 ft (13.7 m) and a deck 34 ft wide.

Who owns IRR BIA RTE 4 over Four Horns Canal?

It is owned by the Bureau of Indian Affairs.