Heeb RD over Baker Creek 080
FairPosted for loadGallatin County, Montana · 5M W Belgrade · Structure no. L16063002+03001
- Built
- 1992
- 33 years old, rebuilt 2024
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 30 ft
- 1 main span
- Daily traffic
- 104
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Heeb RD over Baker Creek 080 is a wood or timber stringer/multi-beam or girder carrying Heeb RD over Baker Creek 080 in Gallatin County, Montana. It was built in 1992 and reconstructed in 2024, so it is 33 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 104 vehicles a day, roughly 3% of them trucks, projected to reach 111 by 2043. The structure is 30 ft (9.1 m) long and 26 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Heeb RD over Baker Creek 080 built?
It was built in 1992, making it 33 years old in 2025. It was reconstructed in 2024.
What condition is Heeb RD over Baker Creek 080 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Heeb RD over Baker Creek 080 carry?
About 104 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Heeb RD over Baker Creek 080?
The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 26 ft wide.
Who owns Heeb RD over Baker Creek 080?
It is owned by the County Highway Agency.