US Bridges

I 90 over Int Bear Canyon

Fair

Gallatin County, Montana · 3.7M E Bozeman · Structure no. I00090313+04472

Built
1962
63 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
113 ft
3 main spans
Daily traffic
9,819
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 over Int Bear Canyon is a prestressed concrete stringer/multi-beam or girder carrying I 90 over Int Bear Canyon in Gallatin County, Montana. It was built in 1962, so it is 63 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,819 vehicles a day, roughly 13% of them trucks, projected to reach 10,702 by 2043. The structure is 113 ft (34.4 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 90
CrossesInt Bear Canyon
Location3.7M E Bozeman
RouteInterstate 90
StateMontana
Coordinates45.65371, -110.94476
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating47 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length113 ft (34.4 m)
Longest span41 ft (12.6 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,819 (2023)
Projected traffic10,702 by 2043
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 over Int Bear Canyon built?

It was built in 1962, making it 63 years old in 2025.

What condition is I 90 over Int Bear Canyon in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I 90 over Int Bear Canyon carry?

About 9,819 vehicles per day (2023 count), of which roughly 13% are trucks.

How long is I 90 over Int Bear Canyon?

The structure is 113 ft (34.4 m) long with a longest span of 41 ft (12.6 m) and a deck 41 ft wide.

Who owns I 90 over Int Bear Canyon?

It is owned by the State Highway Agency.