S 35 over Swan River
FairFlathead County, Montana · Big Fork · Structure no. P00052031+00211
- Built
- 1954
- 71 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 220 ft
- 4 main spans
- Daily traffic
- 9,246
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S 35 over Swan River is a steel continuous stringer/multi-beam or girder carrying S 35 over Swan River in Flathead County, Montana. It was built in 1954, so it is 71 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,246 vehicles a day, roughly 1% of them trucks, projected to reach 9,708 by 2043. The structure is 220 ft (67 m) long and 33 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S 35 over Swan River built?
It was built in 1954, making it 71 years old in 2025.
What condition is S 35 over Swan River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does S 35 over Swan River carry?
About 9,246 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is S 35 over Swan River?
The structure is 220 ft (67 m) long with a longest span of 94 ft (28.7 m) and a deck 33 ft wide.
Who owns S 35 over Swan River?
It is owned by the State Highway Agency.