Cimrhakl RD over Sacagawea Riv 114
FairFergus County, Montana · 8M NE Roy · Structure no. L14104007+01001
- Built
- 1978
- 47 years old, rebuilt 2018
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 47 ft
- 3 main spans
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Cimrhakl RD over Sacagawea Riv 114 is a wood or timber stringer/multi-beam or girder carrying Cimrhakl RD over Sacagawea Riv 114 in Fergus County, Montana. It was built in 1978 and reconstructed in 2018, so it is 47 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 47 ft (14.3 m) long and 24 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cimrhakl RD over Sacagawea Riv 114 built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 2018.
What condition is Cimrhakl RD over Sacagawea Riv 114 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Cimrhakl RD over Sacagawea Riv 114 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Cimrhakl RD over Sacagawea Riv 114?
The structure is 47 ft (14.3 m) long with a longest span of 14 ft (4.3 m) and a deck 24 ft wide.
Who owns Cimrhakl RD over Sacagawea Riv 114?
It is owned by the County Highway Agency.