Trail Creek RD over Mizpah Creek 086
FairCuster County, Montana · 27M SE Miles City · Structure no. L09301016+02001
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 90 ft
- 2 main spans
- Daily traffic
- 56
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Trail Creek RD over Mizpah Creek 086 is a steel stringer/multi-beam or girder carrying Trail Creek RD over Mizpah Creek 086 in Custer County, Montana. It was built in 1981, so it is 44 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 56 vehicles a day, roughly 3% of them trucks, projected to reach 59 by 2043. The structure is 90 ft (27.4 m) long and 24 ft wide. If it were closed, the detour would be 44.7 mi (72 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Trail Creek RD over Mizpah Creek 086 built?
It was built in 1981, making it 44 years old in 2025.
What condition is Trail Creek RD over Mizpah Creek 086 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Trail Creek RD over Mizpah Creek 086 carry?
About 56 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Trail Creek RD over Mizpah Creek 086?
The structure is 90 ft (27.4 m) long with a longest span of 45 ft (13.7 m) and a deck 24 ft wide.
Who owns Trail Creek RD over Mizpah Creek 086?
It is owned by the County Highway Agency.