US Bridges

Forty Mile RD over Owl Creek 085

Fair

Big Horn County, Montana · 2M SE Lodge Grass · Structure no. L02080000+08001

Built
2015
10 years old
Condition
Fair
inspected March 2023
Type
Tee Beam
Prestressed Concrete
Length
57 ft
1 main span
Daily traffic
100
2025 count
Owner
County
County Highway Agency

About this bridge

Forty Mile RD over Owl Creek 085 is a prestressed concrete tee beam carrying Forty Mile RD over Owl Creek 085 in Big Horn County, Montana. It was built in 2015, so it is 10 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 57 ft (17.4 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesForty Mile RD
CrossesOwl Creek 085
Location2M SE Lodge Grass
RouteCounty Highway 2080
StateMontana
Coordinates45.28908, -107.34814
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating31.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span52 ft (15.8 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2025)
Projected traffic100 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Forty Mile RD over Owl Creek 085 built?

It was built in 2015, making it 10 years old in 2025.

What condition is Forty Mile RD over Owl Creek 085 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Forty Mile RD over Owl Creek 085 carry?

About 100 vehicles per day (2025 count), of which roughly 3% are trucks.

How long is Forty Mile RD over Owl Creek 085?

The structure is 57 ft (17.4 m) long with a longest span of 52 ft (15.8 m) and a deck 28 ft wide.

Who owns Forty Mile RD over Owl Creek 085?

It is owned by the County Highway Agency.