US Bridges

Road 325 over No Data Entered

Good

Beaverhead County, Montana · No Data Entered · Structure no. 010206000016346

Built
2014
11 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
40 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Road 325 over No Data Entered is a wood or timber stringer/multi-beam or girder carrying Road 325 over No Data Entered in Beaverhead County, Montana. It was built in 2014, so it is 11 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 40 ft (12.2 m) long and 16 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesRoad 325
CrossesNo Data Entered
LocationNo Data Entered
RouteFederal Lands Road 325
StateMontana
Coordinates44.77073, -112.25071
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.2 US tons
Inventory rating33.2 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width16 ft (4.9 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road 325 over No Data Entered built?

It was built in 2014, making it 11 years old in 2025.

What condition is Road 325 over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Road 325 over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is Road 325 over No Data Entered?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 16 ft wide.

Who owns Road 325 over No Data Entered?

It is owned by the U.S. Forest Service.