Steel Bridge LN over Red Rock River 084
GoodPosted for loadBeaverhead County, Montana · 4M NW Lima · Structure no. 000000202402186
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 60 ft
- 1 main span
- Daily traffic
- 75
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Steel Bridge LN over Red Rock River 084 is a wood or timber stringer/multi-beam or girder carrying Steel Bridge LN over Red Rock River 084 in Beaverhead County, Montana. It was built in 2024, so it is 1 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 75 vehicles a day, roughly 3% of them trucks, projected to reach 80 by 2043. The structure is 60 ft (18.4 m) long and 10 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Steel Bridge LN over Red Rock River 084 built?
It was built in 2024, making it 1 years old in 2025.
What condition is Steel Bridge LN over Red Rock River 084 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Steel Bridge LN over Red Rock River 084 carry?
About 75 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Steel Bridge LN over Red Rock River 084?
The structure is 60 ft (18.4 m) long with a longest span of 58 ft (17.7 m) and a deck 10 ft wide.
Who owns Steel Bridge LN over Red Rock River 084?
It is owned by the County Highway Agency.