US Bridges

Progress Road over Wolf River

Good

Pearl River County, Mississippi · Sec 6 T 3S R14W B · Structure no. SA5500000000046

Built
2006
19 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
320 ft
8 main spans
Daily traffic
680
2023 count
Owner
County
County Highway Agency

About this bridge

Progress Road over Wolf River is a prestressed concrete stringer/multi-beam or girder carrying Progress Road over Wolf River in Pearl River County, Mississippi. It was built in 2006, so it is 19 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 680 vehicles a day, roughly 8% of them trucks, projected to reach 780 by 2045. The structure is 320 ft (97.6 m) long and 30 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesProgress Road
CrossesWolf River
LocationSec 6 T 3S R14W B
RouteCounty Highway 125
Coordinates30.80968, -89.43746
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.8 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length320 ft (97.6 m)
Longest span40 ft (12.2 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic680 (2023)
Projected traffic780 by 2045
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Progress Road over Wolf River built?

It was built in 2006, making it 19 years old in 2025.

What condition is Progress Road over Wolf River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Progress Road over Wolf River carry?

About 680 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Progress Road over Wolf River?

The structure is 320 ft (97.6 m) long with a longest span of 40 ft (12.2 m) and a deck 30 ft wide.

Who owns Progress Road over Wolf River?

It is owned by the County Highway Agency.