US Bridges

Troy Dedeaux Road over Poplar Springs Br

Good

Pearl River County, Mississippi · Sec 27 T 2S R 1W · Structure no. SA550000000A028

Built
2021
4 years old
Condition
Good
inspected May 2023
Type
Channel Beam
Concrete
Length
57 ft
3 main spans
Daily traffic
40
2023 count
Owner
County
County Highway Agency

About this bridge

Troy Dedeaux Road over Poplar Springs Br is a concrete channel beam carrying Troy Dedeaux Road over Poplar Springs Br in Pearl River County, Mississippi. It was built in 2021, so it is 4 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 50 by 2045. The structure is 57 ft (17.4 m) long and 28 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesTroy Dedeaux Road
CrossesPoplar Springs Br
LocationSec 27 T 2S R 1W
RouteCounty Highway 75
Coordinates30.8442, -89.47795
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.3 US tons
Inventory rating37.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width28 ft (8.5 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2023)
Projected traffic50 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Troy Dedeaux Road over Poplar Springs Br built?

It was built in 2021, making it 4 years old in 2025.

What condition is Troy Dedeaux Road over Poplar Springs Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Troy Dedeaux Road over Poplar Springs Br carry?

About 40 vehicles per day (2023 count).

How long is Troy Dedeaux Road over Poplar Springs Br?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 28 ft wide.

Who owns Troy Dedeaux Road over Poplar Springs Br?

It is owned by the County Highway Agency.