US Bridges

Frank Snell Road over Relief

Good

Jackson County, Mississippi · Sec 11 T 5S R 5W B · Structure no. SA300000000A026

Built
2016
9 years old
Condition
Good
inspected December 2024
Type
Channel Beam
Concrete
Length
57 ft
3 main spans
Daily traffic
1,100
2024 count
Owner
County
County Highway Agency

About this bridge

Frank Snell Road over Relief is a concrete channel beam carrying Frank Snell Road over Relief in Jackson County, Mississippi. It was built in 2016, so it is 9 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,100 vehicles a day, roughly 10% of them trucks, projected to reach 1,500 by 2044. The structure is 57 ft (17.4 m) long and 26 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFrank Snell Road
CrossesRelief
LocationSec 11 T 5S R 5W B
RouteCounty Highway 8114
Coordinates30.62545, -88.44956
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.3 US tons
Inventory rating37.8 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width26 ft (7.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2024)
Projected traffic1,500 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Frank Snell Road over Relief built?

It was built in 2016, making it 9 years old in 2025.

What condition is Frank Snell Road over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Frank Snell Road over Relief carry?

About 1,100 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Frank Snell Road over Relief?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 26 ft wide.

Who owns Frank Snell Road over Relief?

It is owned by the County Highway Agency.