US Bridges

Ferguson Road over Trib to Homochitto River

Fair

Copiah County, Mississippi · Sec 8 T 9N R 6E · Structure no. SA1500000000087

Built
2002
23 years old
Condition
Fair
inspected March 2023
Type
Channel Beam
Concrete
Length
57 ft
3 main spans
Daily traffic
10
2015 count
Owner
County
County Highway Agency

About this bridge

Ferguson Road over Trib to Homochitto River is a concrete channel beam carrying Ferguson Road over Trib to Homochitto River in Copiah County, Mississippi. It was built in 2002, so it is 23 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10 vehicles a day, projected to reach 50 by 2045. The structure is 57 ft (17.4 m) long and 25 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesFerguson Road
CrossesTrib to Homochitto River
LocationSec 8 T 9N R 6E
RouteCounty Highway 215
Coordinates31.75908, -90.63278
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.6 US tons
Inventory rating33.3 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 15
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width25 ft (7.5 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2015)
Projected traffic50 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$171,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Ferguson Road over Trib to Homochitto River built?

It was built in 2002, making it 23 years old in 2025.

What condition is Ferguson Road over Trib to Homochitto River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Ferguson Road over Trib to Homochitto River carry?

About 10 vehicles per day (2015 count).

How long is Ferguson Road over Trib to Homochitto River?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.

Who owns Ferguson Road over Trib to Homochitto River?

It is owned by the County Highway Agency.