US Bridges

Rt C E over N Fk Mid Fabius Rv

Good

Schuyler County, Missouri · S 18 T 66 N R 14 W · Structure no. 36733

Built
2022
3 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
96 ft
3 main spans
Daily traffic
304
2024 count
Owner
State
State Highway Agency

About this bridge

Rt C E over N Fk Mid Fabius Rv is a steel continuous stringer/multi-beam or girder carrying Rt C E over N Fk Mid Fabius Rv in Schuyler County, Missouri. It was built in 2022, so it is 3 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 304 vehicles a day, roughly 12% of them trucks, projected to reach 380 by 2044. The structure is 96 ft (29.2 m) long and 27 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesRt C E
CrossesN Fk Mid Fabius Rv
LocationS 18 T 66 N R 14 W
RouteState Highway 0C
Coordinates40.53167, -92.51944
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.4 US tons
Inventory rating47.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length96 ft (29.2 m)
Longest span36 ft (11 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic304 (2024)
Projected traffic380 by 2044
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt C E over N Fk Mid Fabius Rv built?

It was built in 2022, making it 3 years old in 2025.

What condition is Rt C E over N Fk Mid Fabius Rv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Rt C E over N Fk Mid Fabius Rv carry?

About 304 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Rt C E over N Fk Mid Fabius Rv?

The structure is 96 ft (29.2 m) long with a longest span of 36 ft (11 m) and a deck 27 ft wide.

Who owns Rt C E over N Fk Mid Fabius Rv?

It is owned by the State Highway Agency.