US Bridges

US 63 S over N Fk Mid Fabius Rv

Good

Schuyler County, Missouri · S 12 T 66 N R 15 W · Structure no. 36007

Built
2019
6 years old
Condition
Good
inspected December 2023
Type
Tee Beam
Prestressed Concrete
Length
103 ft
1 main span
Daily traffic
2,202
2024 count
Owner
State
State Highway Agency

About this bridge

US 63 S over N Fk Mid Fabius Rv is a prestressed concrete tee beam carrying US 63 S over N Fk Mid Fabius Rv in Schuyler County, Missouri. It was built in 2019, so it is 6 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,202 vehicles a day, roughly 31% of them trucks, projected to reach 3,854 by 2044. The structure is 103 ft (31.5 m) long and 43 ft wide. If it were closed, the detour would be 42.9 mi (69 km).

CarriesUS 63 S
CrossesN Fk Mid Fabius Rv
LocationS 12 T 66 N R 15 W
RouteU.S. Route 63
Coordinates40.54466, -92.53525
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.3 US tons
Inventory rating36.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length103 ft (31.5 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,202 (2024)
Projected traffic3,854 by 2044
Trucks31%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed42.9 mi (69 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 63 S over N Fk Mid Fabius Rv built?

It was built in 2019, making it 6 years old in 2025.

What condition is US 63 S over N Fk Mid Fabius Rv in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does US 63 S over N Fk Mid Fabius Rv carry?

About 2,202 vehicles per day (2024 count), of which roughly 31% are trucks.

How long is US 63 S over N Fk Mid Fabius Rv?

The structure is 103 ft (31.5 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns US 63 S over N Fk Mid Fabius Rv?

It is owned by the State Highway Agency.