US Bridges

Breckenridge Indus over Deer Crk

Good

St. Louis County, Missouri · S 27 T 45 N R 6 E · Structure no. 37014

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
178 ft
2 main spans
Daily traffic
2,000
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Breckenridge Indus over Deer Crk is a prestressed concrete continuous tee beam carrying Breckenridge Indus over Deer Crk in St. Louis County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 15% of them trucks, projected to reach 2,700 by 2043. The structure is 178 ft (54.3 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBreckenridge Indus
CrossesDeer Crk
LocationS 27 T 45 N R 6 E
RouteCity Street 151
Coordinates38.61, -90.33628
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.3 US tons
Inventory rating52.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length178 ft (54.3 m)
Longest span89 ft (27.1 m)
Deck width44 ft (13.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2023)
Projected traffic2,700 by 2043
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Breckenridge Indus over Deer Crk built?

It was built in 2023, making it 2 years old in 2025.

What condition is Breckenridge Indus over Deer Crk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Breckenridge Indus over Deer Crk carry?

About 2,000 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is Breckenridge Indus over Deer Crk?

The structure is 178 ft (54.3 m) long with a longest span of 89 ft (27.1 m) and a deck 44 ft wide.

Who owns Breckenridge Indus over Deer Crk?

It is owned by the City or Municipal Highway Agency.