Laclede Sta. RD over Deer CR
FairPosted for loadSt. Louis County, Missouri · S 28 T 45 N R 6 E · Structure no. 15641
- Built
- 1974
- 51 years old, rebuilt 1994
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 125 ft
- 2 main spans
- Daily traffic
- 34,312
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Laclede Sta. RD over Deer CR is a steel continuous stringer/multi-beam or girder carrying Laclede Sta. RD over Deer CR in St. Louis County, Missouri. It was built in 1974 and reconstructed in 1994, so it is 51 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 34,312 vehicles a day, roughly 10% of them trucks, projected to reach 46,321 by 2044. The structure is 125 ft (38.1 m) long and 70 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Laclede Sta. RD over Deer CR built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1994.
What condition is Laclede Sta. RD over Deer CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Laclede Sta. RD over Deer CR carry?
About 34,312 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Laclede Sta. RD over Deer CR?
The structure is 125 ft (38.1 m) long with a longest span of 62 ft (19 m) and a deck 70 ft wide.
Who owns Laclede Sta. RD over Deer CR?
It is owned by the County Highway Agency.