US Bridges

US 40 E over Is 435 Rp IS70W to Is

Good

Jackson County, Missouri · S 18 T 49 N R 32 W · Structure no. 32891

Built
2009
16 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
286 ft
3 main spans
Daily traffic
5,542
2024 count
Owner
State
State Highway Agency

About this bridge

US 40 E over Is 435 Rp IS70W to Is is a prestressed concrete continuous tee beam carrying US 40 E over Is 435 Rp IS70W to Is in Jackson County, Missouri. It was built in 2009, so it is 16 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,542 vehicles a day, roughly 8% of them trucks, projected to reach 7,482 by 2044. The structure is 286 ft (87.2 m) long and 72 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesUS 40 E
CrossesIs 435 Rp IS70W to Is
LocationS 18 T 49 N R 32 W
RouteU.S. Route 40
Coordinates39.06326, -94.48816
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92.3 US tons
Inventory rating48.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length286 ft (87.2 m)
Longest span113 ft (34.4 m)
Deck width72 ft (21.8 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,542 (2024)
Projected traffic7,482 by 2044
Trucks8%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 40 E over Is 435 Rp IS70W to Is built?

It was built in 2009, making it 16 years old in 2025.

What condition is US 40 E over Is 435 Rp IS70W to Is in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does US 40 E over Is 435 Rp IS70W to Is carry?

About 5,542 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is US 40 E over Is 435 Rp IS70W to Is?

The structure is 286 ft (87.2 m) long with a longest span of 113 ft (34.4 m) and a deck 72 ft wide.

Who owns US 40 E over Is 435 Rp IS70W to Is?

It is owned by the State Highway Agency.