Bu 65 S over Cst East Trfy BNSF RR
FairGreene County, Missouri · S 18 T 29 N R 21 W · Structure no. 5869
- Built
- 1938
- 87 years old, rebuilt 1987
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 824 ft
- 11 main spans
- Daily traffic
- 32,275
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Bu 65 S over Cst East Trfy BNSF RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Bu 65 S over Cst East Trfy BNSF RR in Greene County, Missouri. It was built in 1938 and reconstructed in 1987, so it is 87 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 32,275 vehicles a day, roughly 5% of them trucks, projected to reach 51,640 by 2044. The structure is 824 ft (251.2 m) long and 59 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bu 65 S over Cst East Trfy BNSF RR built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 1987.
What condition is Bu 65 S over Cst East Trfy BNSF RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Bu 65 S over Cst East Trfy BNSF RR carry?
About 32,275 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Bu 65 S over Cst East Trfy BNSF RR?
The structure is 824 ft (251.2 m) long with a longest span of 52 ft (16 m) and a deck 59 ft wide.
Who owns Bu 65 S over Cst East Trfy BNSF RR?
It is owned by the State Highway Agency.