US Bridges

Division ST over N Br of Jordan CR

Good

Greene County, Missouri · S 7 T 29 N R 21 W · Structure no. 30513

Built
2004
21 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
33 ft
2 main spans
Daily traffic
12,130
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Division ST over N Br of Jordan CR is a concrete culvert carrying Division ST over N Br of Jordan CR in Greene County, Missouri. It was built in 2004, so it is 21 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,130 vehicles a day, roughly 10% of them trucks, projected to reach 18,195 by 2044. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDivision ST
CrossesN Br of Jordan CR
LocationS 7 T 29 N R 21 W
RouteCity Street 0
Coordinates37.22565, -93.26498
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.4 US tons
Inventory rating41.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length33 ft (10.1 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,130 (2024)
Projected traffic18,195 by 2044
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Division ST over N Br of Jordan CR built?

It was built in 2004, making it 21 years old in 2025.

What condition is Division ST over N Br of Jordan CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Division ST over N Br of Jordan CR carry?

About 12,130 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Division ST over N Br of Jordan CR?

The structure is 33 ft (10.1 m) long with a longest span of 13 ft (4 m).

Who owns Division ST over N Br of Jordan CR?

It is owned by the City or Municipal Highway Agency.