US Bridges

Main Ave over Fassnight CR

Fair

Greene County, Missouri · S 26 T 29 N R 22 W · Structure no. 34204

Built
2010
15 years old
Condition
Fair
inspected May 2024
Type
Slab
Concrete
Length
69 ft
2 main spans
Daily traffic
500
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Main Ave over Fassnight CR is a concrete slab carrying Main Ave over Fassnight CR in Greene County, Missouri. It was built in 2010, so it is 15 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 750 by 2044. The structure is 69 ft (20.9 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMain Ave
CrossesFassnight CR
LocationS 26 T 29 N R 22 W
RouteCity Street 0
Coordinates37.19132, -93.29685
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.3 US tons
Inventory rating50.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length69 ft (20.9 m)
Longest span34 ft (10.4 m)
Deck width50 ft (15.1 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2024)
Projected traffic750 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Main Ave over Fassnight CR built?

It was built in 2010, making it 15 years old in 2025.

What condition is Main Ave over Fassnight CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Main Ave over Fassnight CR carry?

About 500 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Main Ave over Fassnight CR?

The structure is 69 ft (20.9 m) long with a longest span of 34 ft (10.4 m) and a deck 50 ft wide.

Who owns Main Ave over Fassnight CR?

It is owned by the City or Municipal Highway Agency.