US Bridges

Jefferson Ave over Fassnight CR Bike Path

Fair

Greene County, Missouri · S 25 T 29 N R 22 W · Structure no. 35382

Built
2016
9 years old
Condition
Fair
inspected May 2024
Type
Culvert
Concrete
Length
142 ft
8 main spans
Daily traffic
7,000
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Jefferson Ave over Fassnight CR Bike Path is a concrete culvert carrying Jefferson Ave over Fassnight CR Bike Path in Greene County, Missouri. It was built in 2016, so it is 9 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,000 vehicles a day, roughly 12% of them trucks, projected to reach 10,500 by 2044. The structure is 142 ft (43.3 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesJefferson Ave
CrossesFassnight CR Bike Path
LocationS 25 T 29 N R 22 W
RouteCity Street 0
Coordinates37.18919, -93.29034
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating64.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans8
Design loadHS 20
Structure length142 ft (43.3 m)
Longest span16 ft (4.9 m)
Deck width51 ft (15.5 m)
Roadway width49 ft (14.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,000 (2024)
Projected traffic10,500 by 2044
Trucks12%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Jefferson Ave over Fassnight CR Bike Path built?

It was built in 2016, making it 9 years old in 2025.

What condition is Jefferson Ave over Fassnight CR Bike Path in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Jefferson Ave over Fassnight CR Bike Path carry?

About 7,000 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Jefferson Ave over Fassnight CR Bike Path?

The structure is 142 ft (43.3 m) long with a longest span of 16 ft (4.9 m) and a deck 51 ft wide.

Who owns Jefferson Ave over Fassnight CR Bike Path?

It is owned by the City or Municipal Highway Agency.