US Bridges

Cr. 2 over Miami CR

Fair

Bates County, Missouri · S 32 T 40 N R 31 W · Structure no. 23987

Built
2001
24 years old
Condition
Fair
inspected January 2025
Type
Tee Beam
Prestressed Concrete
Length
138 ft
3 main spans
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

Cr. 2 over Miami CR is a prestressed concrete tee beam carrying Cr. 2 over Miami CR in Bates County, Missouri. It was built in 2001, so it is 24 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 65 by 2043. The structure is 138 ft (42.1 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCr. 2
CrossesMiami CR
LocationS 32 T 40 N R 31 W
RouteCounty Highway 448
Coordinates38.22136, -94.38045
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.5 US tons
Inventory rating40.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length138 ft (42.1 m)
Longest span50 ft (15.2 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic65 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cr. 2 over Miami CR built?

It was built in 2001, making it 24 years old in 2025.

What condition is Cr. 2 over Miami CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does Cr. 2 over Miami CR carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Cr. 2 over Miami CR?

The structure is 138 ft (42.1 m) long with a longest span of 50 ft (15.2 m) and a deck 25 ft wide.

Who owns Cr. 2 over Miami CR?

It is owned by the County Highway Agency.