1502 over Br of Miami CR
FairBates County, Missouri · S 29 T 40 N R 31 W · Structure no. 29305
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 48 ft
- 1 main span
- Daily traffic
- 150
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
1502 over Br of Miami CR is a steel stringer/multi-beam or girder carrying 1502 over Br of Miami CR in Bates County, Missouri. It was built in 2003, so it is 22 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 150 vehicles a day, roughly 10% of them trucks, projected to reach 195 by 2043. The structure is 48 ft (14.6 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 1502 over Br of Miami CR built?
It was built in 2003, making it 22 years old in 2025.
What condition is 1502 over Br of Miami CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does 1502 over Br of Miami CR carry?
About 150 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is 1502 over Br of Miami CR?
The structure is 48 ft (14.6 m) long with a longest span of 47 ft (14.3 m) and a deck 25 ft wide.
Who owns 1502 over Br of Miami CR?
It is owned by the County Highway Agency.