US Bridges

US 10 over I 35W; NB Off Ramp

Good

Ramsey County, Minnesota · At the S JCT TH 10; 35W · Structure no. 62058

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
500 ft
4 main spans
Daily traffic
30,125
2022 count
Owner
State
State Highway Agency

About this bridge

US 10 over I 35W; NB Off Ramp is a prestressed concrete stringer/multi-beam or girder carrying US 10 over I 35W; NB Off Ramp in Ramsey County, Minnesota. It was built in 2012, so it is 13 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,125 vehicles a day, roughly 10% of them trucks, projected to reach 26,000 by 2042. The structure is 500 ft (152.3 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 10
CrossesI 35W; NB Off Ramp
LocationAt the S JCT TH 10; 35W
RouteU.S. Route 10
Coordinates45.08862, -93.18797
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating56.1 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length500 ft (152.3 m)
Longest span152 ft (46.3 m)
Deck width49 ft (15 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,125 (2022)
Projected traffic26,000 by 2042
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 10 over I 35W; NB Off Ramp built?

It was built in 2012, making it 13 years old in 2025.

What condition is US 10 over I 35W; NB Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US 10 over I 35W; NB Off Ramp carry?

About 30,125 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is US 10 over I 35W; NB Off Ramp?

The structure is 500 ft (152.3 m) long with a longest span of 152 ft (46.3 m) and a deck 49 ft wide.

Who owns US 10 over I 35W; NB Off Ramp?

It is owned by the State Highway Agency.