US Bridges

Unu 10 over I 35W; 35W SB Off Ramp

Good

Ramsey County, Minnesota · At the S JCT TH 10; 35W · Structure no. 62057

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
408 ft
4 main spans
Daily traffic
11,550
2014 count
Owner
State
State Highway Agency

About this bridge

Unu 10 over I 35W; 35W SB Off Ramp is a concrete stringer/multi-beam or girder carrying Unu 10 over I 35W; 35W SB Off Ramp in Ramsey County, Minnesota. It was built in 2012, so it is 13 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,550 vehicles a day, roughly 6% of them trucks, projected to reach 13,500 by 2029. The structure is 408 ft (124.5 m) long and 39 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesUnu 10
CrossesI 35W; 35W SB Off Ramp
LocationAt the S JCT TH 10; 35W
Coordinates45.09184, -93.18816
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating75 US tons
Inventory rating44.3 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length408 ft (124.5 m)
Longest span129 ft (39.4 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,550 (2014)
Projected traffic13,500 by 2029
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Unu 10 over I 35W; 35W SB Off Ramp built?

It was built in 2012, making it 13 years old in 2025.

What condition is Unu 10 over I 35W; 35W SB Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Unu 10 over I 35W; 35W SB Off Ramp carry?

About 11,550 vehicles per day (2014 count), of which roughly 6% are trucks.

How long is Unu 10 over I 35W; 35W SB Off Ramp?

The structure is 408 ft (124.5 m) long with a longest span of 129 ft (39.4 m) and a deck 39 ft wide.

Who owns Unu 10 over I 35W; 35W SB Off Ramp?

It is owned by the State Highway Agency.