US Bridges

Csah 58 over Trib Poplar Creek

Good

Pipestone County, Minnesota · 0.3 MI S of JCT TH 75 · Structure no. 59J58

Built
2009
16 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
240
2021 count
Owner
County
County Highway Agency

About this bridge

Csah 58 over Trib Poplar Creek is a concrete culvert carrying Csah 58 over Trib Poplar Creek in Pipestone County, Minnesota. It was built in 2009, so it is 16 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 240 vehicles a day, projected to reach 155 by 2041. The structure is 38 ft (11.5 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCsah 58
CrossesTrib Poplar Creek
Location0.3 MI S of JCT TH 75
RouteCounty Highway 58
Coordinates43.85873, -96.26536
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.8 US tons
Inventory rating43.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 25 or greater
Structure length38 ft (11.5 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic240 (2021)
Projected traffic155 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 58 over Trib Poplar Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is Csah 58 over Trib Poplar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Csah 58 over Trib Poplar Creek carry?

About 240 vehicles per day (2021 count).

How long is Csah 58 over Trib Poplar Creek?

The structure is 38 ft (11.5 m) long with a longest span of 14 ft (4.3 m).

Who owns Csah 58 over Trib Poplar Creek?

It is owned by the County Highway Agency.