US Bridges

T 260 over Poplar Creek

Good

Pipestone County, Minnesota · 0.9 MI S of JCT Csah 9 · Structure no. 59531

Built
1993
32 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete Continuous
Length
113 ft
3 main spans
Daily traffic
60
1997 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 260 over Poplar Creek is a concrete continuous slab carrying T 260 over Poplar Creek in Pipestone County, Minnesota. It was built in 1993, so it is 32 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, projected to reach 60 by 2029. The structure is 113 ft (34.5 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 260
CrossesPoplar Creek
Location0.9 MI S of JCT Csah 9
RouteCounty Highway 260
Coordinates43.86467, -96.22507
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.7 US tons
Inventory rating48.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length113 ft (34.5 m)
Longest span42 ft (12.8 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (1997)
Projected traffic60 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 260 over Poplar Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is T 260 over Poplar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does T 260 over Poplar Creek carry?

About 60 vehicles per day (1997 count).

How long is T 260 over Poplar Creek?

The structure is 113 ft (34.5 m) long with a longest span of 42 ft (12.8 m) and a deck 35 ft wide.

Who owns T 260 over Poplar Creek?

It is owned by the Town or Township Highway Agency.