M 13 over Pedestrian
GoodHennepin County, Minnesota · 0.6 MI W of JCT US 169 · Structure no. 27J63
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2024
- Type
- Culvert
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 4,738
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
M 13 over Pedestrian is a concrete culvert carrying M 13 over Pedestrian in Hennepin County, Minnesota. It was built in 2022, so it is 3 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,738 vehicles a day, projected to reach 7,000 by 2040. The structure is 26 ft (8 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M 13 over Pedestrian built?
It was built in 2022, making it 3 years old in 2025.
What condition is M 13 over Pedestrian in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does M 13 over Pedestrian carry?
About 4,738 vehicles per day (2010 count).
How long is M 13 over Pedestrian?
The structure is 26 ft (8 m) long with a longest span of 26 ft (8 m).
Who owns M 13 over Pedestrian?
It is owned by the City or Municipal Highway Agency.