US Bridges

Msas 148 over Ped-Bike Path

Good

Hennepin County, Minnesota · 0.1 MI W of Green Cir DR · Structure no. 27C25

Built
2020
5 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete
Length
31 ft
1 main span
Daily traffic
2,950
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 148 over Ped-Bike Path is a concrete slab carrying Msas 148 over Ped-Bike Path in Hennepin County, Minnesota. It was built in 2020, so it is 5 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,950 vehicles a day, projected to reach 2,770 by 2039. The structure is 31 ft (9.6 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMsas 148
CrossesPed-Bike Path
Location0.1 MI W of Green Cir DR
RouteCity Street 148
Coordinates44.89912, -93.41303
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating45.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length31 ft (9.6 m)
Longest span29 ft (8.8 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,950 (2019)
Projected traffic2,770 by 2039
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Msas 148 over Ped-Bike Path built?

It was built in 2020, making it 5 years old in 2025.

What condition is Msas 148 over Ped-Bike Path in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Msas 148 over Ped-Bike Path carry?

About 2,950 vehicles per day (2019 count).

How long is Msas 148 over Ped-Bike Path?

The structure is 31 ft (9.6 m) long with a longest span of 29 ft (8.8 m) and a deck 33 ft wide.

Who owns Msas 148 over Ped-Bike Path?

It is owned by the City or Municipal Highway Agency.