NB Oakland Avenue over M-8 Davison Fwy
GoodWayne County, Michigan · In Highland Park · Structure no. 000000000011381
- Built
- 1971
- 54 years old, rebuilt 2000
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 264 ft
- 5 main spans
- Daily traffic
- 6,240
- 1970 count
- Owner
- State
- State Highway Agency
About this bridge
NB Oakland Avenue over M-8 Davison Fwy is a steel continuous stringer/multi-beam or girder carrying NB Oakland Avenue over M-8 Davison Fwy in Wayne County, Michigan. It was built in 1971 and reconstructed in 2000, so it is 54 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,240 vehicles a day, projected to reach 6,240 by 1977. The structure is 264 ft (80.4 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB Oakland Avenue over M-8 Davison Fwy built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2000.
What condition is NB Oakland Avenue over M-8 Davison Fwy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does NB Oakland Avenue over M-8 Davison Fwy carry?
About 6,240 vehicles per day (1970 count).
How long is NB Oakland Avenue over M-8 Davison Fwy?
The structure is 264 ft (80.4 m) long with a longest span of 75 ft (22.9 m) and a deck 63 ft wide.
Who owns NB Oakland Avenue over M-8 Davison Fwy?
It is owned by the State Highway Agency.