John R Street over M-8 Davison Fwy
GoodWayne County, Michigan · Highland Park E/Woodward · Structure no. 000000000011374
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 213 ft
- 2 main spans
- Daily traffic
- 5,600
- 1995 count
- Owner
- State
- State Highway Agency
About this bridge
John R Street over M-8 Davison Fwy is a prestressed concrete stringer/multi-beam or girder carrying John R Street over M-8 Davison Fwy in Wayne County, Michigan. It was built in 1996, so it is 29 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,600 vehicles a day, roughly 5% of them trucks, projected to reach 5,600 by 2015. The structure is 213 ft (64.8 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was John R Street over M-8 Davison Fwy built?
It was built in 1996, making it 29 years old in 2025.
What condition is John R Street over M-8 Davison Fwy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does John R Street over M-8 Davison Fwy carry?
About 5,600 vehicles per day (1995 count), of which roughly 5% are trucks.
How long is John R Street over M-8 Davison Fwy?
The structure is 213 ft (64.8 m) long with a longest span of 106 ft (32.4 m) and a deck 50 ft wide.
Who owns John R Street over M-8 Davison Fwy?
It is owned by the State Highway Agency.