Mc Arthur Road over White Creek I/C Drain
FairTuscola County, Michigan · Sec 20 Novesta Twp · Structure no. 000000000010638
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 70
- 2009 count
- Owner
- County
- County Highway Agency
About this bridge
Mc Arthur Road over White Creek I/C Drain is a prestressed concrete box beam or girders - multiple carrying Mc Arthur Road over White Creek I/C Drain in Tuscola County, Michigan. It was built in 2001, so it is 24 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 70 vehicles a day, projected to reach 125 by 2029. The structure is 61 ft (18.6 m) long and 31 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mc Arthur Road over White Creek I/C Drain built?
It was built in 2001, making it 24 years old in 2025.
What condition is Mc Arthur Road over White Creek I/C Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Mc Arthur Road over White Creek I/C Drain carry?
About 70 vehicles per day (2009 count).
How long is Mc Arthur Road over White Creek I/C Drain?
The structure is 61 ft (18.6 m) long with a longest span of 59 ft (18.1 m) and a deck 31 ft wide.
Who owns Mc Arthur Road over White Creek I/C Drain?
It is owned by the County Highway Agency.