Phillips Road over White Creek I/C Drain
GoodTuscola County, Michigan · Sec 19-20 Novesta Twp · Structure no. 000000000010637
- Built
- 1973
- 52 years old
- Condition
- Good
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 680
- 2009 count
- Owner
- County
- County Highway Agency
About this bridge
Phillips Road over White Creek I/C Drain is a prestressed concrete tee beam carrying Phillips Road over White Creek I/C Drain in Tuscola County, Michigan. It was built in 1973, so it is 52 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 680 vehicles a day, projected to reach 1,225 by 2029. The structure is 45 ft (13.7 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Phillips Road over White Creek I/C Drain built?
It was built in 1973, making it 52 years old in 2025.
What condition is Phillips Road over White Creek I/C Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Phillips Road over White Creek I/C Drain carry?
About 680 vehicles per day (2009 count).
How long is Phillips Road over White Creek I/C Drain?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13 m) and a deck 32 ft wide.
Who owns Phillips Road over White Creek I/C Drain?
It is owned by the County Highway Agency.