Quanicassee Road over Northwest Drain Outlet 1
FairTuscola County, Michigan · Sec 8-9 Gilford Twp · Structure no. 000000000010603
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected May 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 125
- 2009 count
- Owner
- County
- County Highway Agency
About this bridge
Quanicassee Road over Northwest Drain Outlet 1 is a prestressed concrete tee beam carrying Quanicassee Road over Northwest Drain Outlet 1 in Tuscola County, Michigan. It was built in 1980, so it is 45 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125 vehicles a day, projected to reach 225 by 2029. The structure is 35 ft (10.6 m) long and 30 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Quanicassee Road over Northwest Drain Outlet 1 built?
It was built in 1980, making it 45 years old in 2025.
What condition is Quanicassee Road over Northwest Drain Outlet 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Quanicassee Road over Northwest Drain Outlet 1 carry?
About 125 vehicles per day (2009 count).
How long is Quanicassee Road over Northwest Drain Outlet 1?
The structure is 35 ft (10.6 m) long with a longest span of 32 ft (9.8 m) and a deck 30 ft wide.
Who owns Quanicassee Road over Northwest Drain Outlet 1?
It is owned by the County Highway Agency.