US Bridges

Pike Road over Center Line Drain

Good

Tuscola County, Michigan · Sec 20 Gilford Twp · Structure no. 000000000010602

Built
2020
5 years old
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
24
2009 count
Owner
County
County Highway Agency

About this bridge

Pike Road over Center Line Drain is a concrete culvert carrying Pike Road over Center Line Drain in Tuscola County, Michigan. It was built in 2020, so it is 5 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24 vehicles a day, projected to reach 45 by 2029. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPike Road
CrossesCenter Line Drain
LocationSec 20 Gilford Twp
RouteCounty Highway 0
Coordinates43.52237, -83.67211
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadGreater than HL 93
Structure length22 ft (6.7 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24 (2009)
Projected traffic45 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pike Road over Center Line Drain built?

It was built in 2020, making it 5 years old in 2025.

What condition is Pike Road over Center Line Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Pike Road over Center Line Drain carry?

About 24 vehicles per day (2009 count).

How long is Pike Road over Center Line Drain?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m).

Who owns Pike Road over Center Line Drain?

It is owned by the County Highway Agency.