US Bridges

I-75 Conn EB over M-24

Fair

Oakland County, Michigan · @ M-24(I-75 Conn to M-24) · Structure no. 000000000008010

Built
1962
63 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
183 ft
4 main spans
Daily traffic
15,125
2019 count
Owner
State
State Highway Agency

About this bridge

I-75 Conn EB over M-24 is a prestressed concrete stringer/multi-beam or girder carrying I-75 Conn EB over M-24 in Oakland County, Michigan. It was built in 1962, so it is 63 years old, older than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,125 vehicles a day, roughly 3% of them trucks, projected to reach 16,075 by 2039. The structure is 183 ft (55.8 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-75 Conn EB
CrossesM-24
Location@ M-24(I-75 Conn to M-24)
RouteInterstate 75
Coordinates42.69311, -83.24168
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80 US tons
Inventory rating47.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length183 ft (55.8 m)
Longest span63 ft (19.3 m)
Deck width48 ft (14.6 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,125 (2019)
Projected traffic16,075 by 2039
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 Conn EB over M-24 built?

It was built in 1962, making it 63 years old in 2025.

What condition is I-75 Conn EB over M-24 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does I-75 Conn EB over M-24 carry?

About 15,125 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is I-75 Conn EB over M-24?

The structure is 183 ft (55.8 m) long with a longest span of 63 ft (19.3 m) and a deck 48 ft wide.

Who owns I-75 Conn EB over M-24?

It is owned by the State Highway Agency.