Division Avenue over Plaster Creek
GoodKent County, Michigan · Grand Rapids · Structure no. 000000000005197
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 17,251
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Division Avenue over Plaster Creek is a prestressed concrete box beam or girders - single or spread carrying Division Avenue over Plaster Creek in Kent County, Michigan. It was built in 2007, so it is 18 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,251 vehicles a day, roughly 26% of them trucks, projected to reach 21,221 by 2027. The structure is 70 ft (21.3 m) long and 84 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division Avenue over Plaster Creek built?
It was built in 2007, making it 18 years old in 2025.
What condition is Division Avenue over Plaster Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Division Avenue over Plaster Creek carry?
About 17,251 vehicles per day (2021 count), of which roughly 26% are trucks.
How long is Division Avenue over Plaster Creek?
The structure is 70 ft (21.3 m) long with a longest span of 65 ft (19.8 m) and a deck 84 ft wide.
Who owns Division Avenue over Plaster Creek?
It is owned by the City or Municipal Highway Agency.