US-131 NB over Conrail&plaster CR (abn)
FairKent County, Michigan · In Grand Rapids · Structure no. 000000000004946
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 748 ft
- 12 main spans
- Daily traffic
- 57,991
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US-131 NB over Conrail&plaster CR (abn) is a steel stringer/multi-beam or girder carrying US-131 NB over Conrail&plaster CR (abn) in Kent County, Michigan. It was built in 1958, so it is 67 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 57,991 vehicles a day, roughly 7% of them trucks. The structure is 748 ft (228 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-131 NB over Conrail&plaster CR (abn) built?
It was built in 1958, making it 67 years old in 2025.
What condition is US-131 NB over Conrail&plaster CR (abn) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does US-131 NB over Conrail&plaster CR (abn) carry?
About 57,991 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is US-131 NB over Conrail&plaster CR (abn)?
The structure is 748 ft (228 m) long with a longest span of 72 ft (21.9 m) and a deck 46 ft wide.
Who owns US-131 NB over Conrail&plaster CR (abn)?
It is owned by the State Highway Agency.