I-196 M-21 EB over Conrail (no Tracks)(abn)
FairKent County, Michigan · In Wyoming · Structure no. 000000000004806
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 303 ft
- 3 main spans
- Daily traffic
- 53,075
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I-196 M-21 EB over Conrail (no Tracks)(abn) is a steel stringer/multi-beam or girder carrying I-196 M-21 EB over Conrail (no Tracks)(abn) in Kent County, Michigan. It was built in 1963, so it is 62 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 53,075 vehicles a day, roughly 8% of them trucks, projected to reach 61,650 by 2035. The structure is 303 ft (92.3 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-196 M-21 EB over Conrail (no Tracks)(abn) built?
It was built in 1963, making it 62 years old in 2025.
What condition is I-196 M-21 EB over Conrail (no Tracks)(abn) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does I-196 M-21 EB over Conrail (no Tracks)(abn) carry?
About 53,075 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is I-196 M-21 EB over Conrail (no Tracks)(abn)?
The structure is 303 ft (92.3 m) long with a longest span of 104 ft (31.8 m) and a deck 36 ft wide.
Who owns I-196 M-21 EB over Conrail (no Tracks)(abn)?
It is owned by the State Highway Agency.