Lincoln ST over Chippewa River Channel
FairPosted for loadIsabella County, Michigan · In Mt Pleasant · Structure no. 000000000004380
- Built
- 1910
- 115 years old, rebuilt 1994
- Condition
- Fair
- inspected July 2024
- Type
- Arch - Deck
- Concrete
- Length
- 76 ft
- 1 main span
- Daily traffic
- 2,161
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lincoln ST over Chippewa River Channel is a concrete arch - deck carrying Lincoln ST over Chippewa River Channel in Isabella County, Michigan. It was built in 1910 and reconstructed in 1994, so it is 115 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,161 vehicles a day, roughly 2% of them trucks, projected to reach 2,637 by 2039. The structure is 76 ft (23.1 m) long and 37 ft wide. If it were closed, the detour would be 124.3 mi (200 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lincoln ST over Chippewa River Channel built?
It was built in 1910, making it 115 years old in 2025. It was reconstructed in 1994.
What condition is Lincoln ST over Chippewa River Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Lincoln ST over Chippewa River Channel carry?
About 2,161 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is Lincoln ST over Chippewa River Channel?
The structure is 76 ft (23.1 m) long with a longest span of 70 ft (21.3 m) and a deck 37 ft wide.
Who owns Lincoln ST over Chippewa River Channel?
It is owned by the City or Municipal Highway Agency.