US Bridges

M-20 over Chippewa River

Good

Isabella County, Michigan · In Mt Pleasant · Structure no. 000000000004265

Built
1996
29 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
130 ft
1 main span
Daily traffic
10,842
2007 count
Owner
State
State Highway Agency

About this bridge

M-20 over Chippewa River is a prestressed concrete stringer/multi-beam or girder carrying M-20 over Chippewa River in Isabella County, Michigan. It was built in 1996, so it is 29 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,842 vehicles a day, roughly 3% of them trucks, projected to reach 17,709 by 2018. The structure is 130 ft (39.6 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM-20
CrossesChippewa River
LocationIn Mt Pleasant
RouteState Highway 20
Coordinates43.59709, -84.78625
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating49.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length130 ft (39.6 m)
Longest span126 ft (38.3 m)
Deck width65 ft (19.8 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,842 (2007)
Projected traffic17,709 by 2018
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M-20 over Chippewa River built?

It was built in 1996, making it 29 years old in 2025.

What condition is M-20 over Chippewa River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does M-20 over Chippewa River carry?

About 10,842 vehicles per day (2007 count), of which roughly 3% are trucks.

How long is M-20 over Chippewa River?

The structure is 130 ft (39.6 m) long with a longest span of 126 ft (38.3 m) and a deck 65 ft wide.

Who owns M-20 over Chippewa River?

It is owned by the State Highway Agency.